Building a window sash by hand can sound intimidating, but with some practice it can be an enjoyable experience. Early window sash were built by hand designed to be maintainable — if a component broke or rotted out it could be replaced — something that is not possible with most aluminum and vinyl windows you see on the market today.

Continuing Education Department at the North Bennet Street School, Boston, MA
Continuing Education Department at the North Bennet Street School, Boston, MA

A few weekends ago I taught a two day workshop I developed on building a window sash at the North Bennet Street School. This post and the next are a high level recap of the course with some photos from building the prototype in my workshop and what we did in the classroom

Nice quarter-sawn stock for muntins.
Nice quarter-sawn stock for muntins.

Stock selection is important. My wood of choice is Eastern White Pine, preferably quarter-sawn heart pine which is easy to work, weathers well and historically appropriate in my area — the greater Boston area.

Sticking Knife Profile in the Williams and Hussey
Sticking Knife Profile in the Williams and Hussey

A profile can be run by hand using sash planes or using a router table. For larger runs a custom molding knife can make fast work of this often tedious task using a machine like the ‘Williams and Hussey’ molder. (Shown above and below)

Profiling the stock
Profiling the stock

We make a few passes to get near the finished size wanted and then a final cleanup pass at the end to leave the piece with a nice finish.

Profiled stock coming out of the molding machine
Profiled stock coming out of the molding machine

Rails, stiles and muntin stock are run using the same setup on the machine — this way all the profiles are consistent.

Rails, stiles and muntin stock profiled.
Rails, stiles and muntin stock profiled.

Next up is the use of a story stick — this traditional device is effectively a set of plans laid out on a piece of stock that matches the rest of your milled stock. Key locations like mortises are transferred to the work piece by using a marking knife and a combination square. The knife allows for accurate and consistent transfer of measurements to the work-piece.

Using the story stick to transfer measurements to the work piece
Using the story stick to transfer measurements to the work piece

Shown below are mortises cut either with a hollow chisel mortiser or by hand with a mortising chisel. Also note that the work pieces are deliberately left long. These ‘horns’ allow for more relish to support mortise walls from blowing out and also allow the sash to sit in the shop and not ding or damage the piece as it is worked on and eventually glazed.

Mortises cut
Mortises cut

Once the mortises are cleaned up its on to cutting the tenons. Once the piece is laid out I start by cross-cutting the shoulders. (See below). I then use a chisel to pop off the waste or for larger tenons will make a second saw cut (This time ripping down to the shoulder cut) and clean it up with a chisel.

Cutting in to reveal the tenon
Cutting in to reveal the tenon

With the shoulders in place I can dry fit them (using the square shoulders that are on the exterior side of the sash) to make sure I have a tight fit as seen below.  Note that I am not fitting the tenon yet, just the shoulder to start.

Test fit the central muntin
Test fit the central muntin

Next up was the coping. I make use of a saddle block with a 45 degree ramp and some in-cannel chisels to cope the muntin stock as shown below.  With the cope in place I can now test the fit of each of the tenons into its mortise.

Tenon complete and profile coped
Tenon complete and profile coped

This creates a nice tight joint that allows the pieces to mate together in a pleasing manner that allows to profile to make that 90 degree transition from the horizontal to the vertical.

A nicely coped joint
A nicely coped joint

I use a similar process for fitting the horizontal muntins — starting first with the center joint as this can be fussy at times. I want each horizontal muntin to meet cleanly in the center and have both tenons fill as much of the mortise as possible. I leave the stock long so if something goes wrong with the joint I can cut off that inch or so and try again without wasting a whole piece of stock. With the center joint in place I’ll cut the other shoulder and fit it as we did with the vertical muntin and then cope the joint and test those tenons.

Test fitting the shoulders for the horizontal muntins
Test fitting the shoulders for the horizontal muntins

With all the primary joinery completed its time to dry fit it all together and check for square. All the joints should fit together well and the shoulders and copes should be nice and tight.

Test fitting the primary joinery. Note the horns will remain until we paint the sash.
Test fitting the primary joinery. Note the horns will remain until we paint the sash.

If your joints close up with some mild pressure don’t worry too much as the draw bored pins will help pull the joints together and keep them closed. With each stage in this process the sash becomes more and more rigid.

In the next post we’ll talk about making pins, draw-boring, cutting glass and glazing.

Take care,
-Bill

Let There Be Light — Installing New Hand Built Windows

In many posts we’ve talked about why old windows are worth saving and how to build or restore  sash for them, but not much on what it would take to build a new window complete with jamb and trim and install it.

Completed window installed in the side of the barn
Completed window installed in the side of the barn

A while back I had just such an opportunity when working on the timber framed barn workshop of my friend Rich. Much of the work for these windows took place in the shop — building traditional single hung (one moving sash) true divided light windows. A hand built window can offer a VERY long service life, be easily repaired and often look much better than anything you can buy commercially. The ability to build a new jamb to go along with your sashes will allow you to really fine tune the movement of the windows, the exact choice of hardware — if any and allow you to create a distinctive look for your home.

Bill cutting through the wall to install my window.
Bill cutting through the wall to install my window.

Once the shop work was completed, the jamb is complete, the sash are fitted, glazed and the paint has dried it was time to install the completed window unit into the barn.  When working on a timber framed barn you’ll want to make sure you’ve carefully laid out where you want the windows to go — you generally do not want your window obstructed by braces or other framing members. You’ll also want to make sure that you have added in sufficient nailers and/or studs so that your window can be firmly attached to the building.

These hand built windows, complete with jamb, sills, casing and leaded flashing install much the same way you would install an Anderson or Pella new construction drop in window. You’ll want to take the same time and effort to level the window, add insulation if needed, and flash out the window. Once installed you can trim out the interior of the window to blend with the interior surfaces.

Me posing with the newly installed window
Me posing with the newly installed window

If you’ve invested the time to learn how to build a traditional window sash, building an entire window as described here can be a very enjoyable and rewarding experience — plus with these new found skills you can go off and build a window of any size and shape.

Below is a quick slideshow of the above windows being installed into a timber framed barn.

This slideshow requires JavaScript.