Tag Archives: Green Woodworking

26 Horses and 2 Ponies

The best saw horses cannot be bought in a store, you have to build them.  I’ve seen plastic saw horses bend and buckle under < 200 pounds of load.  I’ve seen 2×4 saw horses with sheet metal couplers deform and crush.

When I was a student at NBSS one of the first projects we completed was building a pair of solid wood saw horses that could meet the heavy demands of a preservation carpenter. The school would load them up with more material than I ever thought a simple horse could hold. I was so impressed with how well they turned out I built 10 more while I was there and they have served me well over the years.

28 horses out on parade
28 horses out on parade

Right now as I build a 24’x30′ timber framed barn out in the yard I built another 28 horses to hold all the timber off the ground for sorting and working through the piles. The post below covers how I built these heavy duty horses.

For a large run of horses like this it is important to run through each operation like a small assembly line, though at times it can feel like a slog — after cutting 112 legs you become a master at optimizing all of your operations.

Large pile of green eastern white pine ready to go.
Large pile of green eastern white pine ready to go.

The wood of choice is green eastern white pine we buy from a local sawyer/lumber company. (Copeland And Sons Lumber).  The beams (the work surface of a horse) is cut from a 4x4x12′, the legs are made from 1x6x12′ boards and the gussets are made from 1/2″ CDX plywood.  Buying rough green stock like this from a sawyer helps keep the price per horse reasonable and the wood is full size, not nominal, so my 4×4 is 4″x4″ when I get it.  I estimate that they cost me < $10 each in terms of materials.

You can see how much moisture is still in the 4x4s
You can see how much moisture is still in the 4x4s

A note on working with green lumber, for horses or timber frames or similar projects — this wood was a tree possibly only a day or two before I get it, so if you use a power tool you may get some water spray on you. Be warned. Also make sure you wipe down and oil your tools appropriately so they do not rust. In the photo above you can see the outer 1/4″ or so that has dried a bit vs the wet center on this fresh cut off piece.

Stack of cut beams
Stack of cut beams

I start by cutting the beams to 36″ long. I then cut a 12 degree bevel on two sides. If your table saw cannot cut a full 4″ on an angle you can cut as much as you can, snap off most of the waste and then use a jointer or portable power planer (like 3-1/4″ Makita Door planer) to even out the side.

I also stamped my name into the end grain of each beam with my name stamp. It makes it easy to tell my horses apart from say another friend from the school.

Beam and gusset with dimensions. I also used my namespace on the beam end grain.
Beam and gusset with dimensions. I also used my namespace on the beam end grain.

Next up I ripped my 4×8 sheet of 1/2″ CDX plywood into ~4″ wide strips. I then took a second pass on each strip with the blade set to a 5 degree angle. This allows the gussets to nestle up tightly against the beam during final assembly.

Cutting compound angles for the legs. 5 degrees and 12 degrees.
Cutting compound angles for the legs. 5 degrees and 12 degrees.

Next up I cut all the legs. I set the compound miter saw to cut at a left tilt of 5 degrees and a right rotation of 12 degrees. (See image above). The long side of each leg was cut to be 34.75″ long.

Ripping the legs to a consistent width
Ripping the legs to a consistent width

With all the legs cut I ripped the rough edge off of each board, then ripped the other side so all the boards landed at a consistent 5.5″ width.

Stacks of cut legs
Stacks of cut legs

You don’t have to plane the boards to thickness if you don’t want to. Leaving them as thick as possible added to the strength and I am not thrilled about passing green wood though my cast iron tools and into my dust collection system.  My site chop saw and portable table saw both have aluminum tops which deal better with the wet wood.

112 legs ready to go
112 legs ready to go

All the legs are the same, though above I stacked them to make sure I had a correct number for all the horses I planned to build.  I also used a low angle block plane to break all the edges on the boards since they will be handled many times over the years and you don’t want any splinters.

Stacks of cut legs and beams back in the shop
Stacks of cut legs and beams back in the shop

I then brought my wood into the heated shop as we were getting some snow and stacked them as you see above. This was a big mistake as I’ll describe later. I planned to be out there the next day but with snow and a baby in the house they sat out there for a week. If you bring sopping wet/green wood into a heated shop, make sure you sticker them so air can flow around all the edges and the wood can dry evenly.

Layout for the 2" ceramic star drive deck screws.
Layout for the 2″ ceramic star drive deck screws.

With all the legs cut I started to layout for the screws. I grab two combination squares and set one to be 1″ and set the other to 2″. This allows for fast/efficient layout. (see above image). Each of the screws is either 1″ or 2″ from the edge or top of the board. The screws are staggered to help avoid splitting the wood. I used DeckMate 2″ ceramic coated deck screws that have a nice thick shaft and are rated for outdoor structural use and do not rust. Do NOT use drywall screws on this sort of project, they are far too weak and not meant for the outdoors. One 5lb box of #8 2″ screws was enough to attach all the legs. After layout I pre-drill each of the holes and start the screws into the boards — this makes it a lot easier to assemble the horse later on.

Laying out the beam. 5 degree angle is set in 2.5" from the end. The top of the legs should be 1/4" below the top of the beam.
Laying out the beam. 5 degree angle is set in 2.5″ from the end. The top of the legs should be 1/4″ below the top of the beam.

For the beams I make a tick mark 2.5″ in from each end on the top edge of the beam. Using a protractor I make a 5 degree line down the side of the beam — this splays the legs and gives use  nice stable horse. Having two protractors on hand is nice as I have one set for the right and one set for the left. I then set a combination square to 1/4″ and make a line along the top edge of the beam — this allows me to line up the legs during assembly. I also broke all the edges with a block plane.

Another horse ready to be assembled
Another horse ready to be assembled

Early on I made a few pairs of saw horses to work from and did the majority of the horses as a large run.

Attaching the legs — I added one leg at a time, usually only sinking 2 or 3 of the pre-started screws into the beam. I add one leg, then add the second leg on the same side of the beam. This makes it easier to stand the horse on those two legs and add the third leg. When adding the 4th leg you’ll want to make sure all 4 legs are properly resting on the ground. If your horse wobbles this is your chance to adjust the legs. When the horse is standing the way you want you can sink the rest of the screws on the legs. When using an impact gun you don’t want to sink the screws any further into the wood than you absolutely have to. Ideally the screw heads should come to rest in the same plane as the surface of the wood, but green pine can be a bit soft so some of them may go deeper before they have enough grip to pull the leg tight to the beam.

Mass producing gusset plates.
Mass producing gusset plates.

With a beam and set of legs ready to go and standing nicely you can take a plywood gusset blank, bring it over to the partially assembled horse and trace where it meets the legs. Ideally the gussets should not stick out farther than the legs, otherwise they might catch on things. Making them say 1/32″ inside of the surface of the legs is what I shoot for. Using that traced piece I cut it and label it as a the template and use that for laying out each of the subsequent gussets

Important Notes About Gussets:

1.) When cutting the gusset the beveled end is always ‘up’ on the installed gusset — it mates nicely to the underside of the beam.

2.) When installing a gusset make sure the 5 degree bevel is facing the correct way so that it rest tightly up against the beam.

 

Impromptu work table
Impromptu work table

With a few horses pressed into early service I was able to make a makeshift table that allowed me to layout/mark all the of the gussets. Each one is secured with 4 screws. I made a mark for each screw to be 1″ down from the top or the bottom of the gusset and centered on the thickness of the leg, so for most that would be ~3/8″ in from the mitered edge. I turn a horse on its side and place the marked gusset where it is going to go. I then pre-drill the gusset in place and drive the screws. I used #8 1-5/8″ Deckmate Ceramic Star-drive screws and again a 5lb box was enough for this project.

Each horse required 16 2″ screws and 16 1-5/8″ screws.

Saw horse with dimensions.
Saw horse with dimensions.

And now we have a completed horse! The image above has some more dimensional information for quick reference.

Lunchbox planer getting a workout
Lunchbox planer getting a workout

Now back to that mistake I mentioned earlier. By leaving the cut wet boards tightly stacked a mold/fungus quickly bloomed on half of the boards. I have a lot of allergies so I didn’t want to handle those boards any more than I’d have to, and it was unsightly, so I suited up and with my dust mask and fed them through my lunchbox planer. I also didn’t use my dust collector as I don’t want that wet fungus living in my filter. I planed the rough boards smooth and stickered them up to dry in the sun as I worked on other horses.

Letting the legs air dry a bit
Letting the legs air dry a bit

That little mistake accidentally created ‘Denim Pine’ — pine boards with a blue tint that results from that fungus blooming and is desirable to some folks, presumably non-workers that like the look of it. (See above and below). With the mold/spores/fungus/grossness removed and stickered the legs will dry and be fine to use. As I completed each horse it will live out side where it can dry at a steady rate until the barn gets finished.

Some 'Denim Pine' Legs
Some ‘Denim Pine’ Legs

How do you store all of these horses? 

Mass producing gusset plates.
Stacked horses.

The horses stack nicely and even when stacked all the wood can dry nicely.

Wide angle view of the horses
Wide angle view of the horses

This was the largest run of horses I’ve made to date so I set them all up out in the driveway just to see them all in one place.

2 ponies in the foreground 26 horses in the background
2 ponies in the foreground 26 horses in the background

Two of the horses, my ponies,  had a 24″ beam as two of the 4x4s were a little short and I thought it would be nice to have a set that can fit into a tight place.

It looks like a TON of horses, but these 12, plus the 12 I already had will just barely be enough for the barn build.
It looks like a TON of horses, but these 12, plus the 12 I already had will just barely be enough for the barn build.

What do you plan to do with all these horses?

A LOT of shiplap siding on horses. 10-12" wide 16' long pieces
A LOT of shiplap siding on horses. 10-12″ wide 16′ long pieces

Above and below you can see a couple thousand linear feet of 16′  shiplapped pine sheathing held with ease by these horses.

A LOT of shiplap siding on horses
A LOT of shiplap siding on horses

In the photo below are 24 2″ thick 12″ wide green pine planks that will be used in the barn loft. I estimated this wood to weigh 1800lbs and the 4 horses below seem to hold it with ease.

4 horses holding over 1850+lbs of green pine planking
4 horses holding over 1850+lbs of green pine planking

And below are some 6×9 25′ long timbers.

Horses holding 6"x9"x25' timbers
Horses holding 6″x9″x25′ timbers

As you can see these versatile horses are at home in the shop or out on a worksite and I hope that you’ll build a few pairs for yourself. If you do, please let me know in the comments.

Take care,
-Bill

The Humble Hewing Bench

If you’ve watched Roy Underhill on the Woodwright’s Shop with any regularity then no doubt you’ve seen him using a hewing bench. It’s a great little bench made from half a log on 4 modest legs.  Roy’s used it for hewing, trimming, holding, sitting and many other common shop uses. It’s a project you can complete in an afternoon and will serve you well for many years in the shop.

Why would anyone really want this rough little bench?

If you do any sort of green woodworking it’s nice to have a place you can quickly hew a blank in the shop with a hatchet or similar small ax. When the ax hits the long grain of the bench it will not dig in the way it would if you were using the end grain of a stump or similar log section. (It also protects the reference surfaces of your real workbench) For tapering the end of treenails, splitting wood or roughing a green turning blank  it has been a priceless addition to the workshop.  It also makes a nice place to sit when people visit the shop. 😉

How do I make one of these benches?

Like any good Roy anecdote it starts with “First you find a tree….”

Splitting the oak log with metal wedges and a heavy leather faced mallet
Splitting the oak log with metal wedges and a heavy leather faced mallet

In this case I took a 12-15″ wide and 30″ long section of white oak from a large tree I recently felled in my yard. This tree was over 130 years old so the growth rings are nice and tight. Using metal wedges and a large leather faced mallet I use for my timber framing I split the log in half.

Watch to make sure the split runs the way you want down the log
Watch to make sure the split runs the way you want down the log

If the wedges alone cannot do the whole job of splitting for you, a froe can help it along.

Log split in half. You can clearly see the heartwood and the sapwood
Log split in half. You can clearly see the heartwood and the sapwood

After letting the slabs sit for a few days, it was time to de-bark the logs. If you don’t have a dedicated de-barking spud you can use any tough metal roughly chisel shaped tool or ax. In this case I used a 16lb post hold digger as shown below.

De-barking the log on the right. A metal post hole digging bar makes a good impromptu barking spud.
De-barking the log on the right. A metal post hole digging bar makes a good impromptu barking spud.

Back again in the shop I squared up the edges of the log with a hatchet. Being a green piece of wood this razor sharp ax made quick work of it.

Square up the edges with a hatchet
Square up the edges with a hatchet

I flipped the log over and removed any remaining bark.

Remove any remaining bark with the hatchet
Remove any remaining bark with the hatchet

Now time for the legs…

Ideally you want to split out some 1.5 inch diameter legs. In my case it was snowing and I didn’t have suitable wood on hand to do that, plus the largest ship auger bit I had on hand was 1″. I ripped down some nice straight grained 2x3s I had on hand to 1 1/4″ by 30″ long. I put them on the lathe and turned down the top 6″ to 1″ diameter. I then used a block plane to chamfer the edges.

Split or rip some leg stock. Drill holes with an auger and set your legs
Split or rip some leg stock. Drill holes with an auger and set your legs

Using a ship auger bit I bored a through hole into the log to allow the legs to splay a bit in both directions. After you set the first leg you’ll want to visually reference that first leg when drilling the next leg. Repeat this process for all 4 legs. After test fitting you’ll want to cut a kerf in the end of each tenon and re-install the legs. Make sure those kerfs are perpendicular to the grain of the log so you don’t split it with the wedges. Then glue and wedge the tenons. If you have ever built a windsor chair, this is a cruder version of the same process you’d use to fit the legs and level the feet.

Test fit on a level surface like a table saw
Test fit on a level surface like a table saw

With the legs installed I put the bench on a known level surface, in this case my table saw. Using a compass or similar tool mark higher up on the legs and cut them where you marked them. Then chamfer the ends of the feet and you’re almost done.

Mark what you want to remove to reduce the height and level the feet
Mark what you want to remove to reduce the height and level the feet

Next I applied some end grain sealer (from Land Ark/Heritage Finishes) to reduce the likelihood of splitting in my heated shop. I also trimmed off the wedges and tenons.

Seal the end grain to reduce checking
Seal the end grain to reduce checking

Now the bench is read for use in the shop. This bench, with it’s delicate looking legs, can hold me standing on it, so it should have no problem handling my in shop hewing needs.

Trim the leg stumps and the wedges
Trim the leg stumps and the wedges

Shown here is a Gransfors Bruks hand made Swedish ax. This carpenter’s hatchet is my goto ax for small trimming work and is sharpened to the point of being able to shave with it. The poll (the other business end) of this ax is hardened and can be used like a hammer. The handle is carefully tapered to fit in the hand and without looking you know when your hand is at the end of the handle. The notch under the bit allows you to use this ax much like a large chisel or plane and can yield impressive results. I used this to quickly level bits of the bench surface.

Enjoy your new hewing bench
Enjoy your new hewing bench

For short cash, a few tools and an afternoon in the shop this project is well worth the effort.

Take care,
-Bill